Questões de Concurso Público SERPRO 2010 para Analista - Desenho Instrucional

Foram encontradas 10 questões

Q306814 Inglês
Imagem 008.jpg

According to the text it is correct to assert that
the Capability Maturity Model is likely to become the most recent integrated discipline of engineering management.
Alternativas
Q306815 Inglês
Imagem 008.jpg

According to the text it is correct to assert that
software firms have adopted CMMs successfully.
Alternativas
Q306817 Inglês
Imagem 008.jpg

According to the text it is correct to assert that
the CMMs are quite unlike other software process improvement approaches in terms o f their basic values.
Alternativas
Q306818 Inglês
Imagem 008.jpg

Based on the linguistic structures of the text, judge the
following items.
“indeed" (L.6) can be correctly replaced by in addition to.
Alternativas
Q306820 Inglês
Imagem 008.jpg

Based on the linguistic structures of the text, judge the
following items.
“struggle" (L.13) means to make a determined effort.
Alternativas
Q310128 Inglês
Imagem 005.jpg

Based on the linguistic structures of the text, judge the
following items.
“although” (L.9) is synonymous with even though.
Alternativas
Q310130 Inglês
Imagem 005.jpg

Based on the linguistic structures of the text, judge the
following items.
“by no means” (C. 19) is the same as otherwise.
Alternativas
Q310131 Inglês
Imagem 005.jpg

Based on the linguistic structures of the text, judge the
following items.
he verb to tailor (L.20) is synonymous with to adapt.
Alternativas
Q310132 Inglês
Imagem 005.jpg

Based on the linguistic structures of the text, judge the
following items.
“seek” (123) can be correctly replaced by mix.
Alternativas
Respostas
1: E
2: C
3: E
4: E
5: E
6: C
7: C
8: E
9: C
10: E