Q43307 Inglês
One frequently overlooked area in planning is technical
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan to identify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.

A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.
In a lot of projects, it is hoped that the plan should be able to spot specific risky areas.
Alternativas
Q43305 Inglês
One frequently overlooked area in planning is technical
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan to identify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.

A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.
Large projects demand patient learning to go through it.
Alternativas
Q43304 Inglês
One frequently overlooked area in planning is technical
reviews and inspections. A technical review requires substantial
preparation on the part of the presenters. Documents must be
published and distributed and presentation material organized and
made into slides or overheads. Practice sessions are conducted by
presenters with an audience of critics to prepare for the review.
The reviewers should read the material, attend the
presentations, and write reports. On large projects with many
reviews and walk-throughs involving many participants, a
substantial number of labor hours can be consumed analyzing
documents, attending meetings, and writing reports. For example,
a system design review for one module or unit can require 150
labor hours. When overlooked, this labor can result in a very
large error in resource and schedule estimation.
Many projects include risk assessment and risk
management as a key part of the planning process and expect the
plan to identify specific risk areas. The plan is expected to
quantify both probability of failure and consequences of failure
and to describe what will be done to contain development risk.

A. Behforooz and F. Hudson. Software engineering
fundamentals. Ed. Oxford (adapted).

Based on the text above, judge the following items.
The reviewers must read and rewrite the material while being present in the meetings.
Alternativas
Q2238987 Direito Administrativo
Com base na Lei n.º 10.520/2002, assinale a opção em que é apresentada regra utilizada na fase externa do pregão, iniciada com a convocação dos interessados. 
Alternativas
Q2238985 Direito Administrativo
De acordo com a Lei n.º 8.666/1993, na aquisição de componentes necessários à manutenção de equipamentos de TI durante o período de garantia técnica, a licitação 
Alternativas
Respostas
1311: E
1312: C
1313: E
1314: A
1315: B